Tuesday, April 27, 2010

News article in the Pune Mirror today - 27th April, 2010

http://www.punemirror.in/index.aspx?page=article&sectid=2&contentid=20100427201004270004355396ad0f613&sectxslt=
The bamboo structure (in progress) for the live roof
Cobbing Day 3
Cobbing Day 2
Cobbing Day 1
Waterproofing
Random rubble masonry for the plinth
Foundation with stone and soil

Stone dust bed

Excavation of site
Excavation till soft stone bed
Plan of construction -

As per the design specifications listed by the 2nd and 3rd standard students of Aman Setu, the construction consists of two classroom spaces - one enclosed and the second like a veranda.
The veranda has a champa tree and space around to sit and learn, chat, play and have fun. hrough the veranda one can enter the enclosed classroom which has circular windows to sit in and lots of space to learn and interact.
Both these spaces are sheltered by a self-sustaining live roof.
In totality, the total construction area is 15' by 45-60'

Introduction to the site

Bhuumi Puujan before construction starts

Listing participants' aims and expectations from the apprenticeship

Aman setu campus, Wagholi - Lohegaon road, Pune

www.amansetu.com
http://www.mkf.in/

‘Unbuilding blocks: Unblocking Building’

The Open Space + Aman Setu School
Summer Apprenticeship in Building and Rational Architecture

- 19th April onwards

http://www.mkf.in/pdfs/unbuilding-blocks-unblocking-building.doc